India's best property portal to buy property in India - Proptiger.com
mobilesiteConversionButtonText
mobilesiteConversionCallButtonText

508 sq ft 2 BHK 2T Apartment in Bharat Infrastructure And Engineering Ecovistas Phase III

Basic Details
Amenities71
Specifications

Property Specifications

  • Completed
    Status
  • Jun'23
    Possession Start Date
  • 8 Acres
    Total Area
  • 256
    Total Launched apartments
  • Apr'18
    Launch Date
  • New and Resale
    Availability

Salient Features

  • Properties with 100% power backup available
  • Kalsekar Hospital is 5 km and 20 min away.
  • 200 meters from the proposed Manorail
  • 5 Kms from Mahape, The Business Hub
  • 30 minutes drive to the proposed International Airport at Panvel

.

Approved for Home loans from following banks
  • HDFC (5244)
  • SBI - DEL02592587P
  • Axis Bank

Bharat Ecovistas Phase III Amenities

  • Closed Car Parking
  • Club House
  • Swimming Pool
  • Aggregate area of recreational Open Space
  • Electrical Meter Room, Sub-Station, Receiving Station
  • Energy management
  • Fire Fighting System
  • Internal Roads
  • Landscape Garden and Tree Planting
  • Open Parking
  • Sewage Treatment Plant
  • Solid Waste Management And Disposal
  • Storm Water Drains
  • Street Lighting
  • Sewage Treatment Plant
  • Water Conservation, Rain water Harvesting
  • 24 Hours Water Supply
  • Gymnasium
  • Jogging Track
  • Badminton Court
  • Basketball Court
  • Library
  • Squash Court
  • Tennis Court
  • Health Facilities
  • Jacuzzi
  • Billiards/Snooker Table
  • Toddler Pool
  • Yoga/Meditation Area
  • Vertical Garden
  • Mini Theatre
  • Recreation Facilities
  • School
  • Medical Facilities
  • Tennis Court
  • Grocery / Convenient Store
  • Billiards/Snooker Table
  • Children's play area
  • Car Parking
  • Indoor Games
  • Landscape Garden and Tree Planting
  • Multipurpose Room
  • Community Hall
  • Party Hall
  • Amphitheater
  • 24 Hours Water Supply
  • Rain Water Harvesting
  • Gated Community
  • 24 X 7 Security
  • Fire Fighting System
  • Power Backup
  • Temple
  • Lift Available
  • Sewage Treatment Plant
  • Spa/Sauna/Steam
  • Billiards/Snooker Table
  • Day Care Center
  • Infinity Pool
  • Mini Theatre
  • Party Lawn
  • Yoga/Meditation Area
  • Security Cabin
  • Sun Deck
  • Table Tennis
  • Paved Compound
  • Garbage Disposal
  • Grocery Shop
  • Jacuzzi
  • Lawn Tennis Court
  • Multipurpose Hall
  • Landscaped Gardens

Bharat Ecovistas Phase III Specifications

Doors
Internal:
Flush Shutters
Main:
Flush Door
Walls
Exterior:
Acrylic Emulsion Paint
Interior:
Acrylic Emulsion Paint
Kitchen:
Ceramic Tiles Dado
Toilets:
Ceramic Tiles Dado
Others
Windows:
Aluminium Sliding Windows
Wiring:
Concealed copper wiring
Frame Structure:
RCC framed structure
Switches:
Modular switches
Flooring
Master Bedroom:
Vitrified Flooring
Balcony:
Anti skid ceramic tiles
Toilets:
Anti Skid Ceramic Tiles
Kitchen:
- Vitrified flooring
Living/Dining:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Fittings
Kitchen:
Granite platform with stainless steel sink
Toilets:
Premium Sanitary Fittings

Price & Floorplan

₹ 75.00 L
See Price Inclusions
  •  2 Bathrooms
  •  2 Bedrooms
  •  508 sqft
     carpet area
property size here is carpet area. Built-up area is now available
₹ 75.00 L
See Price Inclusions
  •  2 Bathrooms
  •  2 Bedrooms
  •  508 sqft
     carpet area
property size here is carpet area. Built-up area is now available
₹ 75.30 L
See Price Inclusions
  •  2 Bathrooms
  •  2 Bedrooms
  •  510 sqft
     carpet area
property size here is carpet area. Built-up area is now available
₹ 76.03 L
See Price Inclusions
  •  2 Bathrooms
  •  2 Bedrooms
  •  515 sqft
     carpet area
property size here is carpet area. Built-up area is now available
₹ 77.07 L
See Price Inclusions
  •  2 Bathrooms
  •  2 Bedrooms
  •  522 sqft
     carpet area
property size here is carpet area. Built-up area is now available
Report Error

Other properties in Bharat Infrastructure And Engineering Ecovistas Phase III

  • 2 BHK
Contact NRI Helpdesk on
Whatsapp(Chat Only)
+91-96939-69347
Contact Helpdesk on
Whatsapp(Chat Only)
+91-96939-69347

About Bharat Infrastructure And Engineering

Images for Elevation of Bharat Ecovistas Phase III
  • 47
    Years of Experience
  • 22
    Total Projects
  • 6
    Ongoing Projects
Similar Properties

Discuss about Bharat Ecovistas Phase III

comment
Disclaimer
PropTiger.com is not marketing this real estate project (“Project”) and is not acting on behalf of the developer of this Project. The Project has been displayed for information purposes only. The information displayed here is not provided by the developer and hence shall not be construed as an offer for sale or an advertisement for sale by PropTiger.com or by the developer.

The information and data published herein with respect to this Project are collected from publicly available sources. PropTiger.com does not validate or confirm the veracity of the information or guarantee its authenticity or the compliance of the Project with applicable law in particular the Real Estate (Regulation and Development) Act, 2016 (“Act”).
 Read Disclaimer
Proptiger.com only acts as a medium for advertisement / information content. We do not in any way facilitate and cannot be deemed to be facilitating any transaction between seller / developer and the visitors / users of our website. The details displayed on our website are for information purposes only. Information regarding real estate projects (including the property / project detail, listings, floor area, location, price etc.) are either third party content or sourced from public sources. Nothing contained herein shall be deemed to constitute any sort of legal advise, solicitation, marketing, offer of sale, invitation to offer, invitation to acquire etc. by Proptiger.com. Users of this website are hereby advised to exercise due diligence and to independently validate and verify all information about any property / project before deciding to purchase the same or taking any other action. Information on this website does not guarantee that the developer / project is registered under the Real Estate (Regulation and Development) Act, 2016 or is compliant with the same, and the same should also be verified independently.
Okay, Got It