


Price on request
Builder Price
Configuration
2 BHK
Builtup area
969 sq ft
Possession Status
Completed
Overview
- Possession Start DateMar'24
- StatusCompleted
- Launch DateFeb'23
- AvailabilityResale
Salient Features
- A sewage treatment plant is available for efficient waste management.
- Rainwater harvesting systems are implemented.
- The Learning Tree Pre and Primary School, Ghaziabad, is located 1.9 km away.
- MYRA Hospital is situated 1.7 km away.
Project Specifications
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Others
Wiring:
Concealed Copper Wiring with Adequate Points
Points:
Kitchen
Switches:
Modular electrical switches
Frame Structure:
Earthquake resistant RCC framed structure
GD Estates Floor Plans
- 2 BHK
-
GD Estates Amenities
- 24X7 Water Supply
- Rain Water Harvesting
- Gated Community
- 24 X 7 Security
- CCTV
- Intercom
- Full Power Backup
- Internal Roads
- Lift(s)
- Sewage Treatment Plant
GD Estates Gallery
About GD Group
- Total Projects6
- Ongoing Projects0








