India's best property portal to buy property in India - Proptiger.com

Pioneer Golden Bells Phase I

Possession : Dec'17
Rera

Pioneer Golden Bells Phase I

Price on request
Builder Price
Configuration
1, 2 BHK
Carpet Area1 sq M = 10.76 sq ft
480 - 680 sq ft
Possession Status
Completed
Overview
  • Possession Start Date
    Dec'17
  • Status
    Completed
  • Total Area
    1 Acres
  • Total Launched apartments
    44
  • Launch Date
    Mar'15
  • Availability
    Resale
  • RERA ID
    P52100004990
Approved for Home loans from following banks
  • HDFC (5244)
  • Axis Bank
  • PNB Housing
  • Indiabulls
  • Citibank
  • DHFL
  • L&T Housing (DSA_LOSOT)
  • IIFL
  • + 3 more banksshow less

Project Specifications

Doors
Internal:
Wooden Frame
Main:
Decorative Flush Door
Flooring
Kitchen:
Vitrified Tiles
Living/Dining:
Vitrified Tiles
Master Bedroom:
Vitrified Tiles
Other Bedroom:
Vitrified Tiles
Toilets:
Anti Skid Ceramic Tiles
Walls
Exterior:
Semi Acrylic Paint
Interior:
Oil Bound Distemper
Kitchen:
Glazed Tiles Dado
Toilets:
Glazed Tiles Dado up to 7 Feet Height Above Platform
Fittings
Toilets:
EWC
Kitchen:
Aquagaurd
Others
Windows:
3 Track Powder Coated Aluminium Windows
Wiring:
Concealed copper wiring
Switches:
Modular switches
Frame Structure:
Earthquake resistant RCC framed structure
Pioneer Golden Bells Phase I Floor Plans
  • 1 BHK
  • 2 BHK
-
-
Pioneer Golden Bells Phase I Amenities

About Pioneer Construction

Pioneer Construction
  • Years of experience29
  • Total Projects5
  • Ongoing Projects2

More projects by Pioneer Construction

Similar Projects

Developer Network

  • 400+
    Reputed Developers
All information, images, videos, specifications, and representations related to the project displayed on PropTiger.com are provided by the developer and may differ from the actual property. Users are advised to independentlyverify all project details, approvals, registrations, and compliance under applicable laws, including RERA, before making any purchase decision. Proptiger acts only as a channel partner developer defaults, non-compliance, or actions taken by authorities regarding the project or developer. By using the platform, users also consent to being contacted for feedback or relevant communication, with the option to opt out at any time....